Type
Signals
Project number
1062
Council Districts
06

Scope

PHASE 1 includes fiber optic cable installation and minor signal upgrades on Piedmont Ave between 14th and 15th St. PHASE 2 includes full signal upgrades (signal poles, controller cabinet, 4G communication, detection, pedestrian signals and push-buttons, ADA ramps, and signal timing improvements) at the intersection with The Prado NE (Botanical Garden entrance).

Paid

Project Start

Aug 2016

Design Finish

Jul 2020

Construction Start

May 2025

Construction Finish

Apr 2027
Disclaimer: Project schedules and scopes are subject to change.

Percent Complete

Phase

Not Started
Not Started
Planning/Scoping
Planning/Scoping
Engineering/Design
Engineering/Design
Procurement
Procurement
Construction
Construction
Closeout
Closeout

Additional Project Information