Scope
Completing the final mile of connectivity along Peachtree Rd from Shadowlawn Ave to Maple Dr to existing bus stop and the Buckhead MARTA station. The project will include a typical section with three lanes in each direction with a raised landscape median. The project also includes new bicycle lanes, header curb, and a shoulder comprised of landscape strip and sidewalk on both sides of the roadway.