Scope
Construction of new sidewalk, concrete curbing, drainage structures, traffic signs and pavement striping along the west side of New Hope Road SW beginning from Gilford Forest Drive, SW to approximately 250 feet south of Brightwood Lane SW. This will provide pedestrian safety and connectivity.