Scope
Repair failed section of bridge deck with through hole and exposed rebars in span 1, right lane of the north bound traffic. Repair or rebuild failed joints in spans 1 and 2 and rebuild joint headers. Remove loose and spalled concrete in this area, form new rebars and tie to existing where feasible and pour new concrete to form a new bridge deck. Repair spalled concrete areas with exposed reinforcement in span 1 and approaches.