Installation of sidewalks where needed to provide contiguous sidewalk coverage on both sides of the roadway, and construction of a connection to the Southside BeltLine Trail at the eastern extent of the corridor.
Paid
0
Project Start
Mar 2024
Design Finish
Nov 2026
Construction Start
Feb 2027
Construction Finish
May 2028
Disclaimer: Project schedules and scopes are subject to change.