Erin Ave Sidewalk Replacement & Beltline Connection

Type
Sidewalks
Project number
4027
Council Districts
12

Scope

Installation of sidewalks where needed to provide contiguous sidewalk coverage on both sides of the roadway, and construction of a connection to the Southside BeltLine Trail at the eastern extent of the corridor.

Paid

Project Start

Mar 2024

Design Finish

Construction Start

Mar 2027

Construction Finish

Jun 2028
Disclaimer: Project schedules and scopes are subject to change.

Percent Complete

Phase

Not Started
Not Started
Planning/Scoping
Planning/Scoping
Engineering/Design
Engineering/Design
Procurement
Procurement
Construction
Construction
Closeout
Closeout

Additional Project Information

Project Videos