Design and construction of an intersection between Allene Ave SW, Avon Ave SW, and the Southside BeltLine Trail that maximizes pedestrian safety using site-appropriate industry best practices.
Paid
0
Project Start
Apr 2024
Design Finish
Feb 2026
Construction Start
May 2026
Construction Finish
Aug 2027