Techwood Drive NW from North Avenue NW to Bobby Dodd Way NW Techwood Drive NW from North Avenue NW to Bobby Dodd Way NW Techwood Drive NW from North Avenue NW to Bobby Dodd Way NW Techwood Drive NW from North Avenue NW to Bobby Dodd Way NW Techwood Drive NW from North Avenue NW to Bobby Dodd Way NW

Projects

  • Type

  • Phase

  • Council District

View all projects on Our
Interactive Map

Name Type Phase Council District
Roadway Improvements
Downtown Atlanta Infrastructure Improvement Project
Roadway Improvements Construction 1, 2, 3, 4, 5
Street Repairs
2023 LMIG Resurfacing
Street Repairs Closeout All
Multipurpose Trails
Fulton-Northeast Trail, Segments ROW & Construction (PI 009395)
Multipurpose Trails Planning/Scoping 06
Multipurpose Trails
Fulton-Southside Trail, Segments 2&3 Construction (PI 009397)
Multipurpose Trails Construction 07
Signals
Pedestrian Hybrid Beacons (PHBs) at 5 Locations
Signals Engineering/Design 01, 04, 06
Archive
Pearl Street Traffic Calming
Archive Closeout 05
Street Repairs
2024 LMIG Street Resurfacing
Street Repairs Closeout All
Sidewalks
Westside Beltline Connector Sidewalks
Sidewalks Procurement 03
Sidewalks
Washington Park Sidewalk Connection
Sidewalks Procurement 03, 04
Sidewalks
AUC Sidewalk Connection
Sidewalks Procurement 04
Scroll to Top