AUC Sidewalk Connection

Sidewalks

Type

Sidewalks

Project Number

3062

Council Districts

04

Scope

The AUC Sidewalk Connection Project will replace approximately 2 miles of existing sidewalk within the 270-acre Atlanta University Center along various streets. The sections of sidewalk include the following streets: Atlanta Student Movement Blvd, Beckwith St, Bonair St, Drummond St, Elm St, Joseph E Lowery Blvd, Mildred St, Milton St, Mitchell St, Ozone St, Parsons St, Paschal Blvd, SNCC Way, Vine St, Walnut St, and Webster St.

Current Budget

$2,200,000.00

Paid

$0.00
Project Start
2023-08-11

Anticipated Design Finish

2025-12-19

Construction Start

2026-05-13
Construction Finish
2027-01-23

Disclaimer: Project schedules and scopes are subject to change.