Pedestrian Hybrid Beacons (PHBs) at 5 Locations

Signals

Type

Signals

Project Number

3070

Council Districts

01,04,06

Scope

Installation of Pedestrian Hybrid Beacons (PHBs) at 5 Locations within the City of Atlanta, including signing, marking, curb ramps, signals, and ITS for pedestrian safety, and associated right-of-way, utility, erosion control and landscaping plans. Pedestrian Hybrid Beacons at the following 5 locations within the City: Boulevard SE @ Delmar Ave SE; Boulevard SE @ Rosalia St SE; 717 Lee St SW; Lee St SW @ York Ave SW and 2170 Cheshire Bridge Rd.

Current Budget

$1,091,232.54

Paid

$101400.20
Project Start
2024-06-17

Anticipated Design Finish

2026-09-13

Construction Start

2026-11-05
Construction Finish
2027-07-02

Disclaimer: Project schedules and scopes are subject to change.

Phase

  • Not Started
  • Planning/Scoping
  • Engineering/Design
  • Procurement
  • Construction
  • Closeout