Techwood Drive NW from North Avenue NW to Bobby Dodd Way NW Woodland Avenue SE from Lyndale Drive SE to Burn Street SE Colmer Avenue SE from Moreland Avenue SE to Mortimer Street SE North Avenue NE from Oakdale Road NE to Candler Park Drive NE Tuxedo Road NW from Northside Drive NW to West Paces Ferry Road NW FIFA Fan Festival Road Closures and Delivery

Safe Streets

Pedestrian Hybrid Beacons (PHBs) at 5 Locations

Signals

Type

Signals

Project Number

3070

Council Districts

01,04,06

Scope

Installation of Pedestrian Hybrid Beacons (PHBs) at 5 Locations within the City of Atlanta, including signing, marking, curb ramps, signals, and ITS for pedestrian safety, and associated right-of-way, utility, erosion control and landscaping plans. Pedestrian Hybrid Beacons at the following 5 locations within the City: Boulevard SE @ Delmar Ave SE; Boulevard SE @ Rosalia St SE; 717 Lee St SW; Lee St SW @ York Ave SW and 2170 Cheshire Bridge Rd.

Current Budget

$1,091,232.54

Paid

$101400.20
Project Start
2024-06-17

Anticipated Design Finish

2026-09-13

Construction Start

2026-11-05
Construction Finish
2027-07-02

Disclaimer: Project schedules and scopes are subject to change.

Phase

  • Not Started
  • Planning/Scoping
  • Engineering/Design
  • Procurement
  • Construction
  • Closeout

No related events selected.

Scroll to Top