Scope
Phase 1 Includes signal upgrades, pedestrian signal upgrades, ADA ramps, striping, intersection upgrades, detection, and signal timing coordination at the following: Claire Dr at 3 locations; Lakewood Ave at 3 locations; Sylvan Rd at 2 locations; and Cleveland Ave at 9 locations. Phase 2 includes signal improvements on Sylvan Rd at 2 locations and Greenbriar Pkwy at 5 locations. Signal Timing has been added to the Design and Construction contract.