Projects

Safe Streets Icn

Safe Street

Complete Streets are designed and operated to enable safe access for all users, including pedestrians, bicyclists, motorists and transit riders of all ages and abilities. They do not have a one size fits all standard so, they may look different and contain different elements depending on the location and use. All streets may not have sidewalks, bike lanes, and transit facilities; they will vary with respect to the community, context of their location, and how they are used.
Bridges Icn

Bridges

In this program we are replacing bridges that have significantly deteriorated and are near the end of their life expectancies (70+ years). These improvements will enhance connectivity and access between neighborhoods.
Street Repairs Icn

Street Repairs

Resurfacing projects preserve and maintain city roads. These projects encompass milling, resurfacing, and restriping of existing roadways. The projects may also include sub-base patching, curb installations/repair, ADA ramp installations and restriping for bicycle lanes.
Sidewalks Icn

Sidewalks

Sidewalk repairs will provide ADA compliant (Americans with Disabilities Act) accessibility around the City for all pedestrians.
Signals Icn

Signals

Traffic signals are being upgraded and optimized throughout Atlanta. These upgrades may include replacing traffic lights, pedestrian buttons, equipment and communication systems, and school-zone beacons.
Multipurpose Trails Icn

Multipurpose Trails

Multi-use trails are pathways designed to promote a healthy lifestyle for many users, including pedestrians, joggers and bikers.
Roadway Improvements Icn

Roadway Improvements

Roadway improvement projects enhance and improve existing city roads. These projects vary in scope, but may encompass widening for turn lanes, paving gravel roads, constructing new roadway extensions and roundabouts, along with resurfacing, striping and sidewalk improvements.
Street Repairs Icn

Resurfacing

Resurfacing projects preserve and maintain city roads. These projects encompass milling, resurfacing, and restriping of existing roadways. The projects may also include sub-base patching, curb installations/repair, ADA ramp installations and restriping for bicycle lanes.
Archive Icn

Archive

Archived projects achieved substantial completion at least one year ago.
  • Type

  • Phase

  • Council District

View all projects on Our
Interactive Map

Name Type Phase Council District
Bridges
Bridge Maintenance, Repair and Replacement
Bridges Construction Citywide
Multipurpose Trails
Blueway Trail Planning
Multipurpose Trails Engineering/Design 7, 8
Multipurpose Trails
PATH400 Northern Extent & Safety Improvements
Multipurpose Trails Construction 7
Multipurpose Trails
PATH Westside Connector & Safety Improvements
Multipurpose Trails Planning/Scoping 3
Sidewalks
Sidewalk Repair on Major Streets
Sidewalks Construction Citywide
Multipurpose Trails
PATH Westside (2 Trail) Beltline
Multipurpose Trails Closeout 3
Sidewalks
Citywide ADA Curb Ramps
Sidewalks Construction Citywide
Safe Streets
Strategic Traffic Calming
Safe Streets Planning/Scoping Citywide
Sidewalks
Fairburn Rd Sidewalk Installation
Sidewalks Construction 10, 11
Sidewalks
Cheshire Bridge Rd Sidewalk Installation
Sidewalks Engineering/Design 6
Scroll to Top