Cheshire Bridge Rd Sidewalk Installation

Sidewalks

Type

Sidewalks

Project Number

4029

Council Districts

6

Scope

Sidewalk installations to address missing segments along the corridor as identified by ATLDOT’s Safety, Equity, and Mobility analysis.

Current Budget

$46,649.00

Paid

$0.00
Project Start
2024-03-01

Anticipated Design Finish

2027-04-18

Construction Start

2027-07-18
Construction Finish
2028-10-14

Disclaimer: Project schedules and scopes are subject to change.