Safe Streets

West Lake Ave Bridge Replacement

Bridges

Type

Bridges

Project Number

1026

Council Districts

03, 04

Scope

Bridge replacement over CSX and MARTA tracks near I-20 and Martin Luther King (MLK) Jr Dr. Design includes sidewalk and shared-use path.

Current Budget

$3,871,620.19

Paid

$1264493.38
Project Start
2017-04-10

Anticipated Design Finish

2027-03-26

Construction Start

2027-12-30
Construction Finish
2030-01-18

Disclaimer: Project schedules and scopes are subject to change.

Phase

  • Not Started
  • Planning/Scoping
  • Engineering/Design
  • Procurement
  • Construction
  • Closeout