Safe Streets

Piedmont Ave TCC Extension

Signals

Type

Signals

Project Number

1062

Council Districts

06

Scope

PHASE 1 includes fiber optic cable installation and minor signal upgrades on Piedmont Ave between 14th and 15th St. PHASE 2 includes full signal upgrades (signal poles, controller cabinet, 4G communication, detection, pedestrian signals and push-buttons, ADA ramps, and signal timing improvements) at the intersection with The Prado NE (Botanical Garden entrance).

Current Budget

$356,799.82

Paid

$55586.75
Project Start
2016-08-26

Anticipated Design Finish

2020-07-15

Construction Start

2025-04-15
Construction Finish
2026-05-05

Disclaimer: Project schedules and scopes are subject to change.