Scope

Includes installing curb bulb outs and optimizing right-of-way along Boulevard between Highland Ave and Boulevard Pl. Project also includes construction of mid-block crosswalks, flashing beacons, pedestrian refuge islands, a short sidewalk widening, ADA ramps, and other pedestrian mobility and safety improvements at signalized intersections.

Current Budget

$1,668,913.11

Paid

$249901.85
Project Start
2018-06-18

Anticipated Design Finish

2025-04-30

Construction Start

2027-02-24
Construction Finish
2028-02-23

Disclaimer: Project schedules and scopes are subject to change.

Phase

  • Not Started
  • Planning/Scoping
  • Engineering/Design
  • Procurement
  • Construction
  • Closeout

No related events selected.

Scroll to Top