Techwood Drive NW from North Avenue NW to Bobby Dodd Way NW Techwood Drive NW from North Avenue NW to Bobby Dodd Way NW Techwood Drive NW from North Avenue NW to Bobby Dodd Way NW Techwood Drive NW from North Avenue NW to Bobby Dodd Way NW Techwood Drive NW from North Avenue NW to Bobby Dodd Way NW

Safe Streets

10th St. Pedestrian Safety

Archive

Type

Archive

Project Number

1044

Council Districts

02, 06

Scope

Improves pedestrian and bicycle safety at multiple locations along 10th St. Includes installation of Pedestrian Hybrid Beacon (PHB) at Midtown High School, PHB crossing for pedestrians and bicycles at Myrtle St, and Rectangular Rapid Flashing Beacon (RRFB) at Argonne Ave. Also includes curb extension bulb-outs at each location to improve sight distance and provide for safer crossing.

Current Budget

$396,636.99

Paid

$396636.99
Project Start
2017-01-09

Anticipated Design Finish

2017-09-29

Construction Start

2018-04-10
Construction Finish
2019-10-24

Disclaimer: Project schedules and scopes are subject to change.

Phase

  • Not Started
  • Planning/Scoping
  • Engineering/Design
  • Procurement
  • Construction
  • Closeout

No related events selected.

Scroll to Top