Techwood Drive NW from North Avenue NW to Bobby Dodd Way NW Techwood Drive NW from North Avenue NW to Bobby Dodd Way NW Techwood Drive NW from North Avenue NW to Bobby Dodd Way NW Techwood Drive NW from North Avenue NW to Bobby Dodd Way NW Techwood Drive NW from North Avenue NW to Bobby Dodd Way NW

Safe Streets

Piedmont Ave TCC Extension

Signals

Type

Signals

Project Number

1062

Council Districts

06

Scope

PHASE 1 includes fiber optic cable installation and minor signal upgrades on Piedmont Ave between 14th and 15th St. PHASE 2 includes full signal upgrades (signal poles, controller cabinet, 4G communication, detection, pedestrian signals and push-buttons, ADA ramps, and signal timing improvements) at the intersection with The Prado NE (Botanical Garden entrance).

Current Budget

$356,799.82

Paid

$55586.75
Project Start
2016-08-26

Anticipated Design Finish

2020-07-15

Construction Start

2025-04-15
Construction Finish
2026-05-05

Disclaimer: Project schedules and scopes are subject to change.

Phase

  • Not Started
  • Planning/Scoping
  • Engineering/Design
  • Procurement
  • Construction
  • Closeout

No related events selected.

Scroll to Top