Includes the replacement of the Childress Dr Bridge over South Utoy Creek between Key Dr and Cascade Rd. The bridge will include two 12-foot lanes and sidewalk on the east side of Childress Dr.
Paid
2860150
Project Start
Jan 2016
Design Finish
Jun 2017
Construction Start
Jul 2018
Construction Finish
Jul 2020
Disclaimer: Project schedules and scopes are subject to change.